Project Details
Calculation Results
Limestone Calculator Guide
Calculating limestone needs is essential for driveways, walkways, landscaping, and construction projects. This comprehensive guide helps you determine exactly how much limestone to order, saving money and ensuring your project success.
Volume (yd³) = Length × Width × Depth ÷ 27
Weight (tons) = Volume × Density ÷ 2000
Standard crushed limestone density ≈ 2700 lb/yd³ (1.35 tons/yd³)
Our calculator supports 8 different limestone types with project-specific recommendations and waste factor calculations!
Limestone Types and Densities
Different limestone sizes and types have different densities and uses:
| Type / Size | Density (lb/yd³) | Coverage | Best Uses |
|---|---|---|---|
| Crushed Limestone #57 | 2700 | ~100 ft²/ton @ 2" | Driveways, drainage, decorative |
| Limestone Screenings | 2500 | ~110 ft²/ton @ 2" | Base material, walkways, compaction |
| Limestone Base #21A | 2600 | ~105 ft²/ton @ 2" | Road base, foundations, parking lots |
| Limestone Rip Rap | 2800 | ~95 ft²/ton @ 2" | Erosion control, retaining walls |
| Pea Gravel Limestone | 2550 | ~108 ft²/ton @ 2" | Landscaping, decorative pathways |
| Crushed Limestone #8 | 2650 | ~103 ft²/ton @ 2" | Medium drainage, landscaping |
| Limestone Ballast | 2750 | ~98 ft²/ton @ 2" | Railroad beds, heavy drainage |
| Limestone Dust | 2400 | ~115 ft²/ton @ 2" | Filler, top dressing, stables |
Recommended Depth by Project Type
| Project Type | Recommended Depth | Limestone Type | Notes |
|---|---|---|---|
| Residential Driveway | 4-6 inches | #57, #21A Base | Add 2" base layer for best results |
| Heavy Use Driveway | 6-8 inches | #21A Base + #57 top | Commercial or frequent heavy vehicles |
| Walkway / Path | 2-3 inches | Screenings, Pea Gravel | Light foot traffic |
| Patio Base | 4-6 inches | Screenings, #21A | Under pavers or flagstone |
| Garden Bed | 2-3 inches | Pea Gravel, #57 | Decorative and weed suppression |
| Drainage Layer | 6-12 inches | #57, #8 | French drains, foundation drainage |
| Shed Base | 4-6 inches | #21A, Screenings | Compact well, use landscape fabric |
Practical Calculation Examples
Example 1: Standard Driveway
Calculate limestone for a 50' × 12' driveway, 4" deep:
Step 1: Convert depth to feet: 4" ÷ 12 = 0.333 ft
Step 2: Volume = 50 ft × 12 ft × 0.333 ft = 200 ft³
Step 3: Convert to cubic yards: 200 ÷ 27 = 7.41 yd³
Step 4: Weight = 7.41 yd³ × 2700 lb/yd³ = 20,000 lbs
Step 5: Tons = 20,000 ÷ 2000 = 10 tons
With 10% waste: 10 × 1.10 = 11 tons needed
Example 2: Garden Path
Pea gravel limestone path, 30' × 3', 2" deep:
Area: 30 ft × 3 ft = 90 ft²
Depth: 2" = 0.167 ft
Volume: 90 ft² × 0.167 ft = 15 ft³ = 0.56 yd³
Weight: 0.56 yd³ × 2550 lb/yd³ = 1,428 lbs = 0.71 tons
Alternative: 90 ft² ÷ 108 ft²/ton = 0.83 tons (with waste)
Example 3: Large Parking Area
100' × 40' parking lot, 6" #21A base:
Volume: 100 × 40 × 0.5 = 2,000 ft³ = 74.07 yd³
Weight: 74.07 yd³ × 2600 lb/yd³ = 192,592 lbs
Tons: 192,592 ÷ 2000 = 96.3 tons
With 10% waste: 96.3 × 1.10 = 106 tons
Truckloads: 106 tons ÷ 10 tons/truck = ~11 loads
Coverage Charts by Depth
Crushed Limestone #57 (2700 lb/yd³) Coverage:
- 1 inch deep: 1 ton covers ~200 ft²
- 2 inches deep: 1 ton covers ~100 ft²
- 3 inches deep: 1 ton covers ~65 ft²
- 4 inches deep: 1 ton covers ~50 ft²
- 6 inches deep: 1 ton covers ~33 ft²
- 8 inches deep: 1 ton covers ~25 ft²
Quick Reference - Tons per 100 Square Feet:
- 2" deep: 0.5 tons
- 3" deep: 0.75 tons
- 4" deep: 1.0 tons
- 6" deep: 1.5 tons
- 8" deep: 2.0 tons
Waste Factor Guidelines
Always add extra material for these reasons:
- Compaction Loss: Material settles 10-15% when compacted
- Irregular Areas: Non-rectangular areas waste 5-10%
- Uneven Ground: Dips and hills require 5-15% extra
- Spillage: Delivery and spreading loses 2-5%
- Future Repairs: Keep 5-10% for maintenance
- Recommended Total: 10-20% for most projects
Limestone Size Guide
Common Sizes Explained:
- #57 Stone: 3/4" to 1" - Most popular for driveways
- #8 Stone: 3/8" to 1/2" - Good for walkways and drainage
- #10 Screenings: Dust to 1/4" - Excellent base, compacts well
- #21A: Mixed sizes 0-1" - Road base material
- Pea Gravel: 1/4" to 3/8" - Smooth, decorative
- Rip Rap: 4" to 24" - Large, erosion control
Cost Estimating Guide (2024 Averages)
| Material | Price Range (per ton) | Delivery Cost | Total Estimate |
|---|---|---|---|
| Crushed Limestone #57 | $15 - $30 | $50 - $150 | Varies by region |
| Limestone Screenings | $18 - $35 | $50 - $150 | Base material |
| Limestone Base #21A | $20 - $40 | $50 - $150 | Road grade quality |
| Pea Gravel Limestone | $25 - $50 | $50 - $150 | Decorative premium |
| Rip Rap | $30 - $60 | $75 - $200 | Specialty material |
Bagged vs. Bulk Limestone
Bagged Limestone (50 lb bags):
- Cost: $3-6 per bag (50 lbs = 0.025 tons)
- Coverage: ~0.5 ft² @ 4" deep per bag
- 40 bags = 1 ton = $120-240
- Best for: Small projects under 1 ton
- Advantage: No delivery fee, buy as needed
- Disadvantage: 3-5× more expensive than bulk
Bulk Limestone (by the ton):
- Cost: $15-40 per ton delivered
- Minimum order: Usually 5-10 tons
- Best for: Projects over 1 ton
- Advantage: Much cheaper per ton
- Disadvantage: Delivery fee, minimum orders
Truck Load Sizes
- Small Dump Truck: 5 tons (6-7 yd³)
- Standard Dump Truck: 10 tons (12-14 yd³)
- Large Dump Truck: 15-20 tons (18-24 yd³)
- Tri-Axle: 20-25 tons (25-30 yd³)
- Semi Trailer: 25-30 tons (30-35 yd³)
Installation Tips
Site Preparation:
- Remove grass, weeds, and organic material
- Excavate to proper depth (limestone depth + base)
- Grade for proper drainage (2% slope minimum)
- Install landscape fabric to prevent weed growth
- Ensure stable soil - add base if soft or clay
Installation Steps:
- Excavate area 2" deeper than final grade
- Compact subgrade thoroughly
- Lay landscape fabric (optional but recommended)
- Spread limestone in 2-3" layers
- Compact each layer with plate compactor
- Water lightly to help compaction
- Add final layer and compact again
- Rake smooth and roll final surface
Compaction Equipment:
- Hand Tamper: Small areas under 50 ft²
- Plate Compactor: Driveways and paths (rent $50-80/day)
- Roller Compactor: Large areas, parking lots
- Water Truck: Helps bind and compact screenings
Maintenance Schedule
- Monthly: Rake to redistribute material
- Seasonally: Add 1/2-1" fresh limestone to high-traffic areas
- Annually: Grade and roll entire surface
- Every 2-3 years: Add 1-2" new layer and compact
- As needed: Fill ruts, potholes, and low spots
Common Problems and Solutions
Rutting and Potholes:
- Cause: Insufficient base, poor compaction, drainage issues
- Fix: Fill with fresh limestone, compact thoroughly
- Prevention: Proper base depth, good drainage, regular maintenance
Limestone Migrating/Spreading:
- Cause: No edge restraint, too much traffic on edges
- Fix: Install edge restraints (timbers, pavers, edging)
- Prevention: Border material, proper grading
Washout from Rain:
- Cause: Poor drainage, wrong limestone type
- Fix: Improve drainage, use screenings as base
- Prevention: Crown driveway, install drainage ditches
Weeds Growing Through:
- Cause: No landscape fabric, insufficient depth
- Fix: Hand pull, use vinegar or weed killer
- Prevention: Landscape fabric, 4"+ depth, regular maintenance
Comparison with Other Driveway Materials
| Material | Cost (per ft²) | Lifespan | Maintenance | Pros & Cons |
|---|---|---|---|---|
| Crushed Limestone | $1 - $3 | 5-10 years | Moderate | ✓ Cheap ✓ Easy DIY ✗ Needs topping |
| Gravel | $1 - $3 | 5-10 years | Moderate | ✓ Cheap ✓ Drainage ✗ Migrates |
| Asphalt | $3 - $7 | 15-20 years | Low-Moderate | ✓ Smooth ✓ Durable ✗ Cracks ✗ Sealing |
| Concrete | $4 - $10 | 25-40 years | Very Low | ✓ Permanent ✓ Clean ✗ Expensive ✗ Cracks |
| Pavers | $10 - $25 | 25-50 years | Low | ✓ Beautiful ✓ Repairable ✗ Very expensive |
Environmental Considerations
- Permeable Surface: Limestone allows rainwater infiltration
- Natural Material: No petroleum products like asphalt
- Local Sourcing: Usually quarried locally, low transport emissions
- Heat Island Effect: Light colored, reflects heat vs. dark asphalt
- Wildlife Friendly: Permeable surface better for soil and insects
- Alkaline pH: Can affect soil pH nearby (good for some plants)
When to Call a Professional
Consider hiring contractors for:
- Projects over 500 ft² or 10 tons
- Slopes over 10% grade
- Areas with poor drainage or soft soil
- Commercial or heavy vehicle use
- When you lack proper compaction equipment
- Complex grading or drainage issues
Frequently Asked Questions
Q: How long does limestone last?
A: With proper installation and maintenance, 5-10 years. Top dressing every 2-3 years extends life significantly.
Q: Can I drive on limestone immediately?
A: After proper compaction, yes. However, avoid heavy vehicles for first few days. Full settling takes 1-2 weeks.
Q: What's the difference between #57 and screenings?
A: #57 is 3/4" stone for top layer and drainage. Screenings are fine dust/powder for base that compacts hard.
Q: Do I need landscape fabric?
A: Recommended but not required. Fabric prevents weeds and keeps limestone from mixing with soil below.
Q: How do I prevent dust?
A: Use screenings as base (compacts hard), or spray with water/dust control additives. Some dust is normal.
Q: Can I install limestone over grass?
A: No. Always remove all organic material and excavate to proper depth. Grass will decompose and create soft spots.
Q: What's the best depth for a driveway?
A: Minimum 4 inches for light use, 6 inches for regular use, 8 inches for heavy vehicles. Add 2" screenings base for best results.
Need More Calculators?
Explore our complete collection of construction and landscaping calculators to plan your project perfectly.
Browse All Calculators